New-build project Zimmermannplatz 6 in Vienna, 9th district, Alsergrund (1090)
Zimmermannplatz 6, 1090 Alsergrund, Wien
Fully refurbished Gründerzeit building with a new roof storey in Vienna's 9th district
Highlights
- Refurbished Gründerzeit corner building with a two-level roof extension
- Two penthouses with roof terraces on the 2nd attic floor
- Dual-aspect apartments facing Zimmermannplatz and the garden
- Period ceiling heights and features preserved
Features
Apartment
- Herringbone parquet (period apartments)
- Long-plank flooring (attic)
- Large-format porcelain stoneware
- Natural stone (in places)
- Multiple glazing
- External sun shading (new-build section)
- Balcony, loggia or terrace (some units)
- Intensively planted terraces
- Roof terrace shading
- Branded ceramics
- Sanitary ware from well-known manufacturers
- Underfloor heating, room-by-room control
- Floor-based cooling in summer
- Split-unit cooling (attic)
- KNX building automation (attic)
Building & surroundings
- Passenger lift from cellar to attic
- Lift with penthouse control
- Step-free building entrance
- Bike room
- Storage cellar
- Communal courtyard garden
- Central air-source heat pump
Location
Apartments for sale in Zimmermannplatz 6 – 12 available from € 380,000
About the project
Historic fabric. Modern architecture.
A place with history, reshaped for the highest standards of contemporary living. High-quality architecture, sustainable construction and well-thought-out floor plans create state-of-the-art living space. The Gründerzeit building contains 9 period apartments that are being completely refurbished. Above them, the 1st attic floor adds 4 single-level new-build apartments with a loggia, balcony or terrace, and the 2nd attic floor holds 2 single-level penthouses with roof terraces.
The corner property stands on Zimmermannplatz in Vienna's 9th district. The period apartments look out either across the square or onto the garden, some in both directions. All refurbished units are supplied by a newly installed heat pump. The ground floor also contains a retail unit of around 125 m².
Preserving the old. Building the new.
The staircase and common areas are carefully refurbished and given high-quality finishes. A new lift runs from the cellar to the roof and has its own control for the two penthouses. The building entrance and lift access are step-free, the façade is being restored, and a step-free bike room completes the building.
Period apartments
Period apartments with 2 to 4 rooms from the ground floor to the 3rd floor. All existing apartments are refurbished in keeping with their style, preserving the ceiling heights and period features. Views extend across the square or into the garden; many apartments run through the building, with rooms facing both ways and light from two sides.
Apartments in the new roof
6 new-build apartments with outdoor space: four on the 1st attic floor with a loggia, balcony or terrace, and above them 2 penthouses with a terrace and roof terrace. All attic apartments are on a single level and therefore step-free inside the apartment as well.
Fit-out
Herringbone parquet in the period apartments, long-plank flooring in the attic, large-format porcelain stoneware in bathrooms and utility rooms, natural stone in places. Branded ceramics and sanitary ware from well-known manufacturers. Heating and cooling come from an air-source heat pump on the roof: underfloor heating in winter and floor-based cooling in summer, plus split-unit cooling and KNX building automation in the attic. Intensively planted terraces, external sun shading in the new-build section and a communal garden on the courtyard side for all residents.
Location
Zimmermannplatz lies close to Währinger Straße, surrounded by historic buildings. The U6 station Alser Straße is about 220 m away. Nearby are the lively Liechtensteinstraße and the Servitenviertel with shops, cafés and pharmacies; Viktor-Frankl-Park, Liechtensteinpark and the Old AKH campus offer green retreats.
Timeline
Construction starts Q4 2026. The period apartments are due to be finished by Q2 2027; completion of the attic floors and handover are planned for Q1 2028.