New-build project DUO547 | Breitenfurter Straße in Vienna, 23rd district, Liesing (1230)
Breitenfurter Straße 547, 1230 Liesing, Wien
Living between city and nature
Highlights
- Every apartment with private outdoor space: loggia, balcony, terrace or garden
Features
Apartment
- Plank-style real-wood parquet
- Porcelain stoneware in wet rooms
- White interior doors with wooden frames
- Aluminium-clad PVC windows, triple-glazed, partly floor-to-ceiling
- Radio-controlled external sun shading
- Open-plan living and dining area
- Branded sanitary ware
- Bathtub or low-threshold shower
- Underfloor heating
- Towel radiator in bathroom
- Burglar-resistant apartment entrance door
Building & surroundings
- Underground garage
- Prepared for e-mobility (garage)
- Bike room
- Storage room per apartment
- Landscaped communal areas
- Children's playground
- Rooftop photovoltaic array
- Air-to-water heat pump
Location
Apartments for sale in DUO547 | Breitenfurter Straße – 23 available from € 244,000
About the project
A total of 26 privately financed freehold apartments in two buildings are being built at Breitenfurter Straße 547 in Vienna-Liesing. The 2- to 4-room apartments with living areas of around 45 to 91 m² all have private outdoor space such as a loggia, balcony, terrace or private garden. Common green areas surrounding the complex offer additional room to relax, and a children's playground rounds off the offer for the youngest residents. Trees in the landscaped open areas provide pleasant shade.
Living between city and nature
DUO547 lies where the city merges into the Vienna Woods, right next to Kaltenleutgeben. The surroundings are characterised by single-family houses, plenty of green and a family-friendly neighbourhood. Walks, hikes and bike tours start right at the front door. At the same time, local shops, schools, kindergartens, restaurants and public transport can be reached within a few minutes; the nearest bus stop is only 140 metres away.
Fittings and building services
Photovoltaic systems on the roofs of both houses provide sustainable energy, and heating runs on an air-to-water heat pump. All apartments have underfloor heating, and the bathrooms have towel radiators. Plank-style real-wood parquet, porcelain stoneware in the wet rooms, aluminium-clad PVC windows with triple glazing and radio-controlled external sun shading are part of the specification. Cars park in the complex's own underground garage.
The apartments are sold commission-free directly by the developer. Completion is planned for 2028; according to the project folder (as of July 2026) the apartments will be ready for occupancy from autumn 2028.