New-build project HEINRICH – Old meets New in Vienna, 3rd district, Landstraße (1030)
Kleistgasse 29, 1030 Landstraße, Wien
8 new attic apartments above a period building in the Fasanviertel
Highlights
- Two-storey attic extension on a Viennese period building
- Two penthouses with private roof terrace and optional hot tub
- Fasanviertel near the Schweizergarten
Features
Apartment
- Plank flooring
- Parquet flooring
- Tiled flooring
- Triple-glazed windows
- Bathtub
- Guest WC
- Underfloor heating
- Air conditioning
- Cable/satellite TV connection
- Loggia
- Balcony
- Terrace
- Storage room
Building & surroundings
- Passenger lift
- Step-free access
- Bike room
- Air-to-water heat pump
- Energy class B
Location
Apartments for sale in HEINRICH – Old meets New – 8 available from € 549,000
About the project
HEINRICH – Old meets New
In the sought-after Fasanviertel, at Kleistgasse 29 in Vienna's 3rd district near the Schweizergarten, a stylish period building is being extended with an exclusive two-storey attic conversion. The project combines the charm of classic Viennese architecture with modern living comfort and up-to-date technology. The construction company is Mandlbauer.
Eight new attic apartments
The attic contains 8 newly created apartments with living areas from about 47 m² to 123 m² – five units on the first attic level and three on the second. Well-planned layouts, generous outdoor spaces (loggias, balconies, terraces) and plenty of natural light define life above the rooftops. Top 46 and Top 47 are the only apartments with their own roof terrace (around 61 and 71 m²), reached via a private staircase; a hot-tub area is optionally provided there.
Fittings
Plank flooring, triple-glazed windows, an air-to-water heat pump with underfloor heating and integrated air conditioning provide comfort and energy efficiency (HWB 28.7 kWh/m²a, class B; fGEE 0.68, class A+).
Location
Wien Rennweg station, served by the S-Bahn trunk line (including S1, S2, S3) and tram lines O and 71, is about a 5-minute walk away; Vienna Central Station is around 3 km away. Completion is stated as autumn / Q4 2026; the units are sold commission-free for the buyer, exclusively through CONFIDO Immobilien.