WIEW
1 / 6

Tauschinskygasse 78 – New-build condominiums for sale in 1220 Donaustadt Wien

Tauschinskygasse 78, 1220 Donaustadt, Wien

Future living near Marchfeldcenter

View on the map
Starting price
from€ 634,900
3 available
Floors
4
Units
3
Completion
2027

Highlights

  • Family-friendly location near Marchfeldcenter
  • South-west oriented gardens
  • Ground-floor terrace plus rooftop terrace per unit
  • Fully cellared
  • Energy-efficient heat pump + concrete-core activation
  • PV-ready

About the project

Future living near Marchfeldcenter. In Tauschinskygasse 78 in Vienna's 22nd district, three high-quality houses are being built — one single-family home and one duplex — with thoughtful floor plans, garden, terrace and rooftop terrace. The family-friendly location near the Marchfeldcenter shopping centre combines calm, infrastructure and modern technology in perfect harmony.

The Project

In the middle of a quiet residential area in Vienna's 22nd district, PEPIC Holding GmbH is developing a high-quality residential project at Tauschinskygasse 78 with three units — one single-family home and one duplex. The proximity to the Marchfeldcenter provides excellent local amenities, while kindergartens, schools and public-transport connections are within walking distance — ideal for families looking for a well-designed home in a calm setting.

Living quality & outdoor spaces

The houses feature living areas between 120 m² and 124 m², are fully cellared, and benefit from south-west-facing gardens for optimal sunlight. Each unit has a generous ground-floor terrace and an additional rooftop terrace — perfect for relaxed time outdoors.

Technology & specification

The project also convinces technically with a high level of specification: a ceiling cooling system via concrete-core activation provides a pleasant indoor climate in summer, while underfloor heating powered by an air-water heat pump ensures even warmth during the cold season. The houses are prepared for a photovoltaic system thanks to pre-installed roof conduits. Large windows with triple-glazed thermal insulation, an impressive 5 m sliding-folding door in the living area, and electrically operated external blinds underline the modern, energy-efficient construction. A parking space is included in the purchase price.

Timeline

Construction is scheduled to start in Q1 2026, with belagsfertig completion targeted for the end of Q1 2027. Development charges are already included in the purchase price.

Location

Features

  • 3 houses — 1 single-family home + 1 duplex
  • Living areas between 120 m² and 124 m²
  • 5 rooms per unit
  • Fully cellared (45–47 m² basement)
  • South-west oriented garden (40–80 m²)
  • Ground-floor terrace (25–37 m²) plus rooftop terrace
  • Ceiling cooling via concrete-core activation
  • Underfloor heating with air-water heat pump
  • Photovoltaic-ready (conduit pre-installed)
  • Triple-glazed thermal insulation windows
  • 5 m sliding-folding door in the living area
  • Electrically operated external blinds
  • Parking space included in purchase price
  • Development charges included in purchase price